Construction starts soon on Muskingum flood-control dams
Outline of flood control project for tributary of Ohio River involving construction of 15 dams with total cost of $35,290, 000; distribution of flood control on various rivers in Muskingum Valley; characteristics of official plan of reservoirs, Muskingum watershed.
Construction starts soon on Muskingum flood-control dams
Outline of flood control project for tributary of Ohio River involving construction of 15 dams with total cost of $35,290, 000; distribution of flood control on various rivers in Muskingum Valley; characteristics of official plan of reservoirs, Muskingum watershed.
Construction starts soon on Muskingum flood-control dams
Eng News-Rec
Knappen, T.T. (author)
Engineering News-Record ; 113
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
Construction starts soon on Hoover Dam
Engineering Index Backfile | 1931
Muskingum Flood Routing Model With Multiple-Tributaries
British Library Conference Proceedings | 1996
|On the Muskingum-Cunge flood routing method
Online Contents | 1995
|Analysis of Muskingum Equation Based Flood Routing Schemes
British Library Online Contents | 2000
|