A platform for research: civil engineering, architecture and urbanism
Construction methods and equipment on new Madrid floodway
Floodway is being created by constructing new levee 5 mi. back from existing frontline levee and extending from Birds Point, Mo., opposite Cairo, Ill., to New Madrid, Mo.; primary purpose is to reduce stage of floods which go higher than 55 on Cairo gage (55 is 5 ft. lower than levee grade in that vicinity).
Construction methods and equipment on new Madrid floodway
Floodway is being created by constructing new levee 5 mi. back from existing frontline levee and extending from Birds Point, Mo., opposite Cairo, Ill., to New Madrid, Mo.; primary purpose is to reduce stage of floods which go higher than 55 on Cairo gage (55 is 5 ft. lower than levee grade in that vicinity).
Construction methods and equipment on new Madrid floodway
Pub. Works
Public Works ; 62
1931
3 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Drainage works for new Madrid floodway
Engineering Index Backfile | 1931
|Constructing 35-mile new Madrid floodway levee
Engineering Index Backfile | 1931
|Construction details of morganza floodway bridge
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1944