A platform for research: civil engineering, architecture and urbanism
Constructing 35-mile new Madrid floodway levee
Graphs of five equipment processes in placing 11,000,000 yd. of earth in levee embankment ranging from 8 to 22 ft. in height; data on construction with draglines in series; construction with tower excavator; construction by tractors and wagons; dragline and railway haulage; hydraulic dredge construction; engineering direction.
Constructing 35-mile new Madrid floodway levee
Graphs of five equipment processes in placing 11,000,000 yd. of earth in levee embankment ranging from 8 to 22 ft. in height; data on construction with draglines in series; construction with tower excavator; construction by tractors and wagons; dragline and railway haulage; hydraulic dredge construction; engineering direction.
Constructing 35-mile new Madrid floodway levee
Eng. News-Rec
Knappen, T.T. (author)
Engineering News-Record ; 106
1931
6 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Floodway System Operation along Levee-Protected Rivers
ASCE | 2013
|Floodway System Operation along Levee-Protected Rivers
British Library Online Contents | 2014
|Drainage works for new Madrid floodway
Engineering Index Backfile | 1931
|Construction methods and equipment on new Madrid floodway
Engineering Index Backfile | 1931