A platform for research: civil engineering, architecture and urbanism
Supply system of Bavarian Zugspitze mountain railway
Section Garmish-Partenkirchen to Platt supplied with direct current at 1650 volts, aerial ropeway from Platt to summit operated by three-phase current at 400 volts, 50 cycles; entire supply system functions automatically.
Supply system of Bavarian Zugspitze mountain railway
Section Garmish-Partenkirchen to Platt supplied with direct current at 1650 volts, aerial ropeway from Platt to summit operated by three-phase current at 400 volts, 50 cycles; entire supply system functions automatically.
Supply system of Bavarian Zugspitze mountain railway
AEG Progress
1931
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Zugspitze rack and funicular railway in Bavarian Alps
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1927
Hochgebirgsbaustelle Zugspitze
Online Contents | 1994
Construction of Bavarian "Zugspitz" railway
Engineering Index Backfile | 1929
Brecheranlage arbeitet an der Zugspitze
Online Contents | 2002