A platform for research: civil engineering, architecture and urbanism
Special methods for building tower footings in river bed
Construction of transmission line crossing over Skeena River in British Columbia, about 8000 ft. wide, called for cofferdamming with steel-sheet piling, underwater placing of concrete and depositing of rip-rap; max. single span 2100 ft.; choice of crossing arrangement; crossing and anchor towers; stringing of conductors. (See also Contract Rec vol. 44, no. 18, May 6, 1931 pp. 527-531, 8 figs)
Special methods for building tower footings in river bed
Construction of transmission line crossing over Skeena River in British Columbia, about 8000 ft. wide, called for cofferdamming with steel-sheet piling, underwater placing of concrete and depositing of rip-rap; max. single span 2100 ft.; choice of crossing arrangement; crossing and anchor towers; stringing of conductors. (See also Contract Rec vol. 44, no. 18, May 6, 1931 pp. 527-531, 8 figs)
Special methods for building tower footings in river bed
Elec. News
Henderson, G.R. (author) / Davies, V.R. (author)
1931
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Special methods for building tower footings in river bed
Engineering Index Backfile | 1931
|Templet for transmission tower footings
Engineering Index Backfile | 1931
|Uplift resistance of transmission tower footings
Engineering Index Backfile | 1962
|Concrete piles make economical tower footings
Engineering Index Backfile | 1946
|On uplift resistance of transmission tower footings
Engineering Index Backfile | 1964
|