A platform for research: civil engineering, architecture and urbanism
Use of precut cables and development of attractive tower structure with unusual facilities for access, combined with rapid erection schedule, characterized construction of double-circuit 132-kv. crossing of Baton Rouge Electric Co. over Mississippi River near Baton Rouge, La.; major design features of 3750-ft. span. (See also Elec. World vol. 98, no. 2, July 11, 1931 pp. 66-67, 3 figs)
Use of precut cables and development of attractive tower structure with unusual facilities for access, combined with rapid erection schedule, characterized construction of double-circuit 132-kv. crossing of Baton Rouge Electric Co. over Mississippi River near Baton Rouge, La.; major design features of 3750-ft. span. (See also Elec. World vol. 98, no. 2, July 11, 1931 pp. 66-67, 3 figs)
Father of waters spanned in four days
Stone Webster Jl
Furlong, H.W. (author)
1931
6 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
|Recent wide-spanned reinforced concrete bridges
Engineering Index Backfile | 1913
|Straightening father of waters
Engineering Index Backfile | 1936
|Straightening father of waters
Engineering Index Backfile | 1936
|Recent experiences on large multi-spanned bridges
British Library Conference Proceedings | 2005
|