A platform for research: civil engineering, architecture and urbanism
584-ft timber deck truss bridge on Alaska Highway 164 mi north of Dawson Creek, BC, completed in 23 weeks while river was frozen over; truss quarter sections fabricated on river ice before being raised into place; timber pretreated.
584-ft timber deck truss bridge on Alaska Highway 164 mi north of Dawson Creek, BC, completed in 23 weeks while river was frozen over; truss quarter sections fabricated on river ice before being raised into place; timber pretreated.
Sikanni chief river spanned
Western Construction News
Powell, W.S. (author)
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Recent wide-spanned reinforced concrete bridges
Engineering Index Backfile | 1913
|Father of waters spanned in four days
Engineering Index Backfile | 1931
|Recent experiences on large multi-spanned bridges
British Library Conference Proceedings | 2005
|Flexural Behaviour of Vertically Spanned Reinforced Block Masonry Walls
British Library Conference Proceedings | 1989
|