A platform for research: civil engineering, architecture and urbanism
Grouting operations used to repair badly cracked and porous portions of 30-year-old gravity concrete dam on Merced River, Calif., by San Joaquin Light and Power Corp.; doweling of new concrete.
Grouting operations used to repair badly cracked and porous portions of 30-year-old gravity concrete dam on Merced River, Calif., by San Joaquin Light and Power Corp.; doweling of new concrete.
Grouting cracks restores 30-year-old dam on merced river
Eng. News-Rec
Fox, H.K. (author)
Engineering News-Record ; 107
1931
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New merced falls hydroelectric plant on Merced river
Engineering Index Backfile | 1932
|Construction surveys for merced river project
Engineering Index Backfile | 1968
|Internal grouting restores stone masonry piers
Engineering Index Backfile | 1934
The merced irrigation district
Engineering Index Backfile | 1926
|Online Contents | 1975
|