A platform for research: civil engineering, architecture and urbanism
Development consists of concrete dam and spillway, 20 ft high and 560 ft long, concrete intake structure, concrete spiral scroll case and elbow-type draft tube, hydraulic turbine and direct connected vertical-type electric generator, oil-storage house and substation; details of equipment and constructional methods; plant contains first outdoor generating unit in California.
Development consists of concrete dam and spillway, 20 ft high and 560 ft long, concrete intake structure, concrete spiral scroll case and elbow-type draft tube, hydraulic turbine and direct connected vertical-type electric generator, oil-storage house and substation; details of equipment and constructional methods; plant contains first outdoor generating unit in California.
New merced falls hydroelectric plant on Merced river
Universal Engr
Fox, H.K. (author)
Universal Engineer ; 55
1932
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1975
|The merced irrigation district
Engineering Index Backfile | 1926
|Construction surveys for merced river project
Engineering Index Backfile | 1968
|British Library Online Contents | 2005
|Grouting cracks restores 30-year-old dam on merced river
Engineering Index Backfile | 1931
|