A platform for research: civil engineering, architecture and urbanism
Madden dam, Panama canal zone
Straight concrete-gravity dam of 220 ft. max. height, 1200 ft. long, also several earth, gravel and rock-fill saddle dams, to form storage reservoir on Chagres River to be used in operation of Panama Canal locks. (Anonymous descriptions) (See also New Reclamation Era vol. 22, no. 4, Apr. 1931 pp. 75-78, 2 figs; and Eng. News-Rec., vol. 107, no. 5, July 30, 1931, pp. 162-164, 3 figs.)
Madden dam, Panama canal zone
Straight concrete-gravity dam of 220 ft. max. height, 1200 ft. long, also several earth, gravel and rock-fill saddle dams, to form storage reservoir on Chagres River to be used in operation of Panama Canal locks. (Anonymous descriptions) (See also New Reclamation Era vol. 22, no. 4, Apr. 1931 pp. 75-78, 2 figs; and Eng. News-Rec., vol. 107, no. 5, July 30, 1931, pp. 162-164, 3 figs.)
Madden dam, Panama canal zone
West. Construction News
Walter, R.F. (author) / Savage, J.L. (author)
1931
4 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1931
|Geologic study of Madden dam project, Alhajuela, Canal zone
Engineering Index Backfile | 1930
|The Panama canal and conditions in the canal zone
Engineering Index Backfile | 1907
|Integration of the former Panama Canal Zone into Metro Panama City
British Library Conference Proceedings | 2002
|