A platform for research: civil engineering, architecture and urbanism
Cableway bucket concretes owyhee dam at rate of 1000 cu. Yd. per Shift
Mining methods used to remove 38,000 cu. yd. of faulted material to sound rock 190 ft. below streambed; concrete deposited at 1000 cu. yd. per shift by 8-cu. yd. buckets from overhead cableway; concrete plant; concrete placing; characteristics of typical 4-yd. batch; grout outlet for contraction joints; ultimate height of dam 530 ft. (see also Eng. News-Rec., vol. 106, no. 5, Jan. 29, 1931, pp. 178-182, 7 figs.)
Cableway bucket concretes owyhee dam at rate of 1000 cu. Yd. per Shift
Mining methods used to remove 38,000 cu. yd. of faulted material to sound rock 190 ft. below streambed; concrete deposited at 1000 cu. yd. per shift by 8-cu. yd. buckets from overhead cableway; concrete plant; concrete placing; characteristics of typical 4-yd. batch; grout outlet for contraction joints; ultimate height of dam 530 ft. (see also Eng. News-Rec., vol. 106, no. 5, Jan. 29, 1931, pp. 178-182, 7 figs.)
Cableway bucket concretes owyhee dam at rate of 1000 cu. Yd. per Shift
Construction Methods
Construction Methods ; 13
1931
5 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cableway bucket concretes owyhee dam at rate of 1000 cu
Engineering Index Backfile | 1931
Heavy-load cableway installation for Owyhee dam
Engineering Index Backfile | 1930
Electric control for 1300-ft. Cableway at Owyhee dam
Engineering Index Backfile | 1930
|Automatic opening and closing of cableway bucket
Engineering Index Backfile | 1949
|