A platform for research: civil engineering, architecture and urbanism
Heavy-load cableway installation for Owyhee dam
Cableway 1300 ft. long with 3-in. track cable carrying 8-cu. yd. bucket, installed for concreting operations on Owyhee dam; headtower, on trucks, gives radial swing of 550 ft.; tower shuttled and 25-ton load handled by remote control from pilot house overlooking work.
Heavy-load cableway installation for Owyhee dam
Cableway 1300 ft. long with 3-in. track cable carrying 8-cu. yd. bucket, installed for concreting operations on Owyhee dam; headtower, on trucks, gives radial swing of 550 ft.; tower shuttled and 25-ton load handled by remote control from pilot house overlooking work.
Heavy-load cableway installation for Owyhee dam
Eng. News-Rec
Engineering News-Record ; 105
1930
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cableway bucket concretes owyhee dam at rate of 1000 cu
Engineering Index Backfile | 1931
Electric control for 1300-ft. Cableway at Owyhee dam
Engineering Index Backfile | 1930
|Cableway bucket concretes owyhee dam at rate of 1000 cu. Yd. per Shift
Engineering Index Backfile | 1931
Installation of Cableway Cranes
Engineering Index Backfile | 1930