A platform for research: civil engineering, architecture and urbanism
Gibson dam, sun river project, Montana
Contractor's plant; camp and crew; excavation for dam; river diversion; mass concrete in dam; selection of aggregate pit and concrete mix; concrete mixing plant and placing equipment; concreting methods; grouting and drainage; spillway excavation and lining; outlet works and penstocks. (See also - May 10 1931 n 9 p 223-227)
Gibson dam, sun river project, Montana
Contractor's plant; camp and crew; excavation for dam; river diversion; mass concrete in dam; selection of aggregate pit and concrete mix; concrete mixing plant and placing equipment; concreting methods; grouting and drainage; spillway excavation and lining; outlet works and penstocks. (See also - May 10 1931 n 9 p 223-227)
Gibson dam, sun river project, Montana
West. Construction News
1931
6 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Gibson dam -- Sun river project -- Montana
Engineering Index Backfile | 1930
|Gibson dam, sun river project, Montana
Engineering Index Backfile | 1931
Missouri river bridge, Montana
Engineering Index Backfile | 1930
|