A platform for research: civil engineering, architecture and urbanism
Gibson dam, sun river project, Montana
Construction of 195-ft. arch dam by U. S. Bureau of Reclamation creates 90,000-acre-ft. additional irrigation supply for 100,000 acres; measuring intensity of uplift at base of dam by installation of 24 pipes of 3 in. diam.; measuring intensity of uplift pressure within concrete; measurement of variations inconcrete temperature; itemized cost of Gibson dam to Sept. 1, 1930. (See also - May 25 1931 n 10 p 253-258, 14 figs.)
Gibson dam, sun river project, Montana
Construction of 195-ft. arch dam by U. S. Bureau of Reclamation creates 90,000-acre-ft. additional irrigation supply for 100,000 acres; measuring intensity of uplift at base of dam by installation of 24 pipes of 3 in. diam.; measuring intensity of uplift pressure within concrete; measurement of variations inconcrete temperature; itemized cost of Gibson dam to Sept. 1, 1930. (See also - May 25 1931 n 10 p 253-258, 14 figs.)
Gibson dam, sun river project, Montana
West. Construction News
1931
5 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Gibson dam -- Sun river project -- Montana
Engineering Index Backfile | 1930
|Gibson dam, sun river project, Montana
Engineering Index Backfile | 1931
Missouri river bridge, Montana
Engineering Index Backfile | 1930
|