A platform for research: civil engineering, architecture and urbanism
Account of tribulations with which erectors had to contend; bridge site, foundations, shore spans and pylons; creeper cranes used in erection of bridge; attachment of cables to end posts; process of hoisting hangers. Before Instn. Constructional Engrs. (See also - (discussion) p 187-190; (See also Engineer vol. 15, no. 3925, Apr. 3, 1931 pp. 372-373, 9 figs; Iron and Coal Trades Rev., vol. 122, no. 3294, Apr. 17, 1931, p. 613)
Account of tribulations with which erectors had to contend; bridge site, foundations, shore spans and pylons; creeper cranes used in erection of bridge; attachment of cables to end posts; process of hoisting hangers. Before Instn. Constructional Engrs. (See also - (discussion) p 187-190; (See also Engineer vol. 15, no. 3925, Apr. 3, 1931 pp. 372-373, 9 figs; Iron and Coal Trades Rev., vol. 122, no. 3294, Apr. 17, 1931, p. 613)
Construction of the Sydney harbour bridge
Structural Engr
Lewis, J.S. (author)
1931
14 pages
30 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
Engineering Index Backfile | 1924
Engineering Index Backfile | 1934
Engineering Index Backfile | 1932
Engineering Index Backfile | 1932