A platform for research: civil engineering, architecture and urbanism
Breakwater construction in Port Arthur harbour
Construction methods employed, both for timber-crib and for rubble-mound type; methods of transportation and handling adopted to meet special conditions of Lake Superior port. (See also Eng. Jl vol. 14, no. 4, Apr. 1931 pp. 215-224 (discussion) p 224-226, 14 figs)
Breakwater construction in Port Arthur harbour
Construction methods employed, both for timber-crib and for rubble-mound type; methods of transportation and handling adopted to meet special conditions of Lake Superior port. (See also Eng. Jl vol. 14, no. 4, Apr. 1931 pp. 215-224 (discussion) p 224-226, 14 figs)
Breakwater construction in Port Arthur harbour
Engineering
Harcourt, F.Y. (author)
Engineering ; 13
1931
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Breakwater construction in Port Arthur harbour
Engineering Index Backfile | 1931
|Port Arthur harbor breakwater construction
Engineering Index Backfile | 1931
Breakwater extension at Port Arthur
Engineering Index Backfile | 1927
|Numerical analysis of the breakwater construction of Sergipe Harbour, Brazil
British Library Online Contents | 1998
|