A platform for research: civil engineering, architecture and urbanism
Breakwater construction in Port Arthur harbour
Construction methods employed, both for timber-crib and for rubble-mound type; methods of transportation and handling adopted to meet special conditions of Lake Superior port. (See also - (discussion) p 224-226; Engineering, vol. 13, no. 3406, Apr. 24, 1931, p. 543)
Breakwater construction in Port Arthur harbour
Construction methods employed, both for timber-crib and for rubble-mound type; methods of transportation and handling adopted to meet special conditions of Lake Superior port. (See also - (discussion) p 224-226; Engineering, vol. 13, no. 3406, Apr. 24, 1931, p. 543)
Breakwater construction in Port Arthur harbour
Eng. Jl.
Harcourt, F.Y. (author)
Engineering Journal ; 14
1931
10 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Breakwater construction in Port Arthur harbour
Engineering Index Backfile | 1931
|Port Arthur harbor breakwater construction
Engineering Index Backfile | 1931
Breakwater extension at Port Arthur
Engineering Index Backfile | 1927
|Numerical analysis of the breakwater construction of Sergipe Harbour, Brazil
British Library Online Contents | 1998
|