A platform for research: civil engineering, architecture and urbanism
Large concrete bridge arches built without falsework
Taf Fechan bridge, 392 ft long has 227 ft 6 1/4 in. arch span; 280 ft Nant Hir has arch span of 184 ft; both bridges are cantilevering out from abutments entirely without falsework based on placement of rib concrete on traveling shutter, supported by already-constructed rib section; rib is suspended by 1/2-in. diam strand suspension cables; these are anchored to temporary tower raised on bridge deck over arch springing; forces in tower are balanced by further cables anchored in arch abutment; to ensure safety, load on each strand is generally kept as low as 6 tons; strands are individually stressed; changes in suspension forces, as construction goes ahead, are obtained by stressing or destressing required number of cables.
Large concrete bridge arches built without falsework
Taf Fechan bridge, 392 ft long has 227 ft 6 1/4 in. arch span; 280 ft Nant Hir has arch span of 184 ft; both bridges are cantilevering out from abutments entirely without falsework based on placement of rib concrete on traveling shutter, supported by already-constructed rib section; rib is suspended by 1/2-in. diam strand suspension cables; these are anchored to temporary tower raised on bridge deck over arch springing; forces in tower are balanced by further cables anchored in arch abutment; to ensure safety, load on each strand is generally kept as low as 6 tons; strands are individually stressed; changes in suspension forces, as construction goes ahead, are obtained by stressing or destressing required number of cables.
Large concrete bridge arches built without falsework
World Construction
World Construction ; 17
1964
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Multiple arch concrete bridge built on timber falsework
Engineering Index Backfile | 1933
|Large concrete warehouses built with moving falsework
Engineering Index Backfile | 1941
Travelling falsework for arches on curves
Engineering Index Backfile | 1941
|Long steel arches erected by falsework elevator
Engineering Index Backfile | 1936
Long steel arches erected by falsework elevator
Engineering Index Backfile | 1936