A platform for research: civil engineering, architecture and urbanism
Long steel arches erected by falsework elevator
Construction of West and Paalsund bridges in Stockholm, Sweden, including 668-ft span hingeless arch and 183-ft all-welded 2-hinged arch; half-arch spans were lifted at crown while rotating about pins at abutments; pipe columns supporting 78-ft deck; erection equipment consisted of deck traveler and cantilever falsework brackets that steadied and supported columns, floor beam and fascia stringers until they could be joined together. (see also Engineering v 142 n 3695 Nov 6 1936 p 493-6)
Long steel arches erected by falsework elevator
Construction of West and Paalsund bridges in Stockholm, Sweden, including 668-ft span hingeless arch and 183-ft all-welded 2-hinged arch; half-arch spans were lifted at crown while rotating about pins at abutments; pipe columns supporting 78-ft deck; erection equipment consisted of deck traveler and cantilever falsework brackets that steadied and supported columns, floor beam and fascia stringers until they could be joined together. (see also Engineering v 142 n 3695 Nov 6 1936 p 493-6)
Long steel arches erected by falsework elevator
Eng News-Rec
Engineering News-Record ; 117
1936
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Long steel arches erected by falsework elevator
Engineering Index Backfile | 1936
Travelling falsework for arches on curves
Engineering Index Backfile | 1941
|Four miles of bridge spans erected without falsework
Engineering Index Backfile | 1951
Reinforced concrete truss bridges erected without falsework
Engineering Index Backfile | 1920
Rainbow bridge has 950-ft steel arch erected without falsework
Engineering Index Backfile | 1941