A platform for research: civil engineering, architecture and urbanism
Concrete paving methods on Manitoba's main tourist highway
62 mi of concrete pavement will comprise new Winnepeg-Emerson highway; using fully integrated road construction machinery, contractors on 13.7-mi stretch laid as much as 3250 lin ft of 12-ft cement concrete pavement in one day; equipment and methods described and illustrated.
Concrete paving methods on Manitoba's main tourist highway
62 mi of concrete pavement will comprise new Winnepeg-Emerson highway; using fully integrated road construction machinery, contractors on 13.7-mi stretch laid as much as 3250 lin ft of 12-ft cement concrete pavement in one day; equipment and methods described and illustrated.
Concrete paving methods on Manitoba's main tourist highway
Roads Construction
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Manitoba's kettle simmers year 'round
Engineering Index Backfile | 1968
Concrete paving -- Used to surface mountain highway
Engineering Index Backfile | 1939
|Restoration and structural health monitoring of Manitoba's Golden Boy
Online Contents | 2003
|