A platform for research: civil engineering, architecture and urbanism
Driving and concrete lining of 8483 ft. of 10.5 ft. horseshoe-shaped tunnels on route of 70-mi. main canal; construction camp and plant; timbering; ventilation; concreting.
Driving and concrete lining of 8483 ft. of 10.5 ft. horseshoe-shaped tunnels on route of 70-mi. main canal; construction camp and plant; timbering; ventilation; concreting.
Vale irrigation project tunnels, Oregon
West. Construction News
Bashore, H.W. (author)
1930
3 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Earth lining of main canal, vale project, Oregon
Engineering Index Backfile | 1931
|Owyhee irrigation project tunnels
Engineering Index Backfile | 1931
|Canal and drain construction at vale, Oregon
Engineering Index Backfile | 1928
|Owyhee irrigation project, Oregon-Idaho
Engineering Index Backfile | 1931
|Vale starts the S11D iron ore project
Online Contents | 2017