A platform for research: civil engineering, architecture and urbanism
Canal and drain construction at vale, Oregon
U. S. Bureau of Reclamation has in progress important irrigation canal construction and drainage work on Malheur river, in vicinity of Vale, Ore.; main canal for Vale project about 70 miles long; also open drains leading into Malheur river, involving excavation of about 2,000,000 cu. yds.; depths of drains varying from 8 to 12 ft.
Canal and drain construction at vale, Oregon
U. S. Bureau of Reclamation has in progress important irrigation canal construction and drainage work on Malheur river, in vicinity of Vale, Ore.; main canal for Vale project about 70 miles long; also open drains leading into Malheur river, involving excavation of about 2,000,000 cu. yds.; depths of drains varying from 8 to 12 ft.
Canal and drain construction at vale, Oregon
Eng. World
Scott, W.A. (author)
Engineering World ; 32
1928
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Earth lining of main canal, vale project, Oregon
Engineering Index Backfile | 1931
|Vale irrigation project tunnels, Oregon
Engineering Index Backfile | 1930
|Earthwork and structures -- Vale main canal station
Engineering Index Backfile | 1930
Engineering Index Backfile | 1945
|Earthwork and structures, Vale main canal, station 2450-00
Engineering Index Backfile | 1934