A platform for research: civil engineering, architecture and urbanism
Temporary suspension bridge carries 36-in. pipe line over landslide
Emergency measure called for when highway cut causes glide, endangering San Francisco's water supply; work completed in 17 days with no interruption of service; details of construction of temporary timber floor suspension bridge 170 ft. in span.
Temporary suspension bridge carries 36-in. pipe line over landslide
Emergency measure called for when highway cut causes glide, endangering San Francisco's water supply; work completed in 17 days with no interruption of service; details of construction of temporary timber floor suspension bridge 170 ft. in span.
Temporary suspension bridge carries 36-in. pipe line over landslide
Water Works Sewerage
Lauenstein, C.A. (author)
1930
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete arch bridge carries pipe lines
Engineering Index Backfile | 1930
|Oil pipe line suspension bridge
Engineering Index Backfile | 1950
Engineering Index Backfile | 1908
Prestressed bridge carries Cardiff-Penarth road over river Ely
Engineering Index Backfile | 1964
Huge cast-iron pipe line carries cables under river
Engineering Index Backfile | 1930