A platform for research: civil engineering, architecture and urbanism
Building concrete track with minimum interruption of service
After track in Boston had been brought to line and grade with dry broken stone ballast, voids were filled with cement grout, using vibrating machine to assure complete penetration.
Building concrete track with minimum interruption of service
After track in Boston had been brought to line and grade with dry broken stone ballast, voids were filled with cement grout, using vibrating machine to assure complete penetration.
Building concrete track with minimum interruption of service
Elec. Ry. Jl
1930
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete Pipe Leak Repair without Service Interruption
ASCE | 2019
|Concrete Pipe Leak Repair without Service Interruption
TIBKAT | 2019
|Hospital modernizes without interruption to service
Engineering Index Backfile | 1966
|Repair of Concrete Bridges without Interruption of Traffic
British Library Conference Proceedings | 2000
|