A platform for research: civil engineering, architecture and urbanism
Design and construction of Bonnet Carre spillway
Report on construction of flood-control spillway 7700 ft. long, with special reference to concrete; history; description and design of foundations, cut-off walls, abutments, weir, piers, needles; fore-apron and stilling basin, floodway and side levees; concrete testing and inspection; order of concrete construction; contracts.
Design and construction of Bonnet Carre spillway
Report on construction of flood-control spillway 7700 ft. long, with special reference to concrete; history; description and design of foundations, cut-off walls, abutments, weir, piers, needles; fore-apron and stilling basin, floodway and side levees; concrete testing and inspection; order of concrete construction; contracts.
Design and construction of Bonnet Carre spillway
Am. Concrete Inst. -- Jl
Swenholt, H. (author)
1930
20 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of Bonnet Carre spillway
Engineering Index Backfile | 1931
|Problems in design, Bonnet Carre spillway
Engineering Index Backfile | 1929
|Four long trestles cross bonnet carre spillway
Engineering Index Backfile | 1935
|Hydraulic experiments at the Bonnet Carre spillway
Engineering Index Backfile | 1929
|Superload Evaluation of the Bonnet Carre´ Spillway Bridge
Online Contents | 2008
|