A platform for research: civil engineering, architecture and urbanism
Brush and stumps bulldozed to dumps
Description of 3.87 mi. concrete road job with heavy cuts and fills, between Bedminster and Gladstone, N. J., in which tractors were used to limit; concrete bridge completed in zero weather.
Brush and stumps bulldozed to dumps
Description of 3.87 mi. concrete road job with heavy cuts and fills, between Bedminster and Gladstone, N. J., in which tractors were used to limit; concrete bridge completed in zero weather.
Brush and stumps bulldozed to dumps
Contractors Engrs. Monthly
1930
5 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1984
|Microsoft AZ-304 Dumps - Things You Should Know About Our AZ-304 Exam Dumps
BASE | 2022
|Engineering Index Backfile | 1930
British Library Conference Proceedings | 1996
|