A platform for research: civil engineering, architecture and urbanism
Penetration macadam designs and methods of construction
Basic principle of design in Rhode Island; rational design for penetration macadam which can be simply, speedily and economically constructed by contractor and which will give 10 to 15 years of good riding service to public. (See also Can. Engr., vol. 59, no. 21, Nov. 18, 1930, pp. 641-642)
Penetration macadam designs and methods of construction
Basic principle of design in Rhode Island; rational design for penetration macadam which can be simply, speedily and economically constructed by contractor and which will give 10 to 15 years of good riding service to public. (See also Can. Engr., vol. 59, no. 21, Nov. 18, 1930, pp. 641-642)
Penetration macadam designs and methods of construction
Am. Highways
Woolley, C.L. (author)
1930
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Penetration macadam designs and methods of construction
Engineering Index Backfile | 1930
|Penetration macadam, design and construction
Engineering Index Backfile | 1930
|Penetration macadam, design and construction
Engineering Index Backfile | 1930
|Penetration macadam, design and construction
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1928
|