A platform for research: civil engineering, architecture and urbanism
Michigan stabilizes deep peat marshes by blasting and filling to prevent highway settlement
Engineer of design and plans, Michigan State Highway Department, describes method of blasting peat and stripping to solid bottom, upon which road embankment is founded.
Michigan stabilizes deep peat marshes by blasting and filling to prevent highway settlement
Engineer of design and plans, Michigan State Highway Department, describes method of blasting peat and stripping to solid bottom, upon which road embankment is founded.
Michigan stabilizes deep peat marshes by blasting and filling to prevent highway settlement
Construction Methods
Boehler, C.F. (author)
Construction Methods ; 12
1930
3 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Further study of fill settlement in peat marshes
Engineering Index Backfile | 1929
|Embankment settlement behaviour on deep peat
Engineering Index Backfile | 1961
|Settlement calculation of deep stabilized peat and clay
British Library Conference Proceedings | 1996
|Engineering Index Backfile | 1938
Engineering Index Backfile | 1938