A platform for research: civil engineering, architecture and urbanism
Eliminate 29 busy grade crossings
New York Central and Grand Trunk Western complete extensive track elevation and construct joint facilities at South Bend, Ind.; station layout, showing ramps and floor plan of station building; method of grading; street bridges designed for heavy loading; Grand Trunk Western diversion.
Eliminate 29 busy grade crossings
New York Central and Grand Trunk Western complete extensive track elevation and construct joint facilities at South Bend, Ind.; station layout, showing ramps and floor plan of station building; method of grading; street bridges designed for heavy loading; Grand Trunk Western diversion.
Eliminate 29 busy grade crossings
Ry. Age
Railway Age ; 89
1930
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Depresses tracks formerly elevated to eliminate grade crossings
Engineering Index Backfile | 1933
Online Contents | 2012
Online Contents | 1996
Online Contents | 2001
Online Contents | 2002