A platform for research: civil engineering, architecture and urbanism
Depresses tracks formerly elevated to eliminate grade crossings
Unusual grade separation project completed at St Louis, by Wabash at cost of $700,000; involved more than 16 acres of sodding and replacement of 80-ft subway with overhead bridge; map and profile of gradeseparation territory.
Depresses tracks formerly elevated to eliminate grade crossings
Unusual grade separation project completed at St Louis, by Wabash at cost of $700,000; involved more than 16 acres of sodding and replacement of 80-ft subway with overhead bridge; map and profile of gradeseparation territory.
Depresses tracks formerly elevated to eliminate grade crossings
Ry Age
Railway Age ; 96
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Eliminate 29 busy grade crossings
Engineering Index Backfile | 1930
Online Contents | 2012
Online Contents | 1996
Online Contents | 2001
Online Contents | 2002