A platform for research: civil engineering, architecture and urbanism
Construction of quay, 11,000 ft. long, also of passenger station situated 2 mi. from mouth of Tyne River; description of shed 500 ft. long by 60 ft. wide, hydraulic coal hoist, two electric traveling portal cranes of 5 and 3 tons capacity, and seven 1 1/2-ton hydraulic capstans, steel sheet piling and anchor blocks; dredging and sinking of cylinders; electric substation and hydraulic power house. (see also Civil Eng., vol. 24, no. 8, Jan. 1930, p. 391, and Engineering, vol. 129, no. 3347, Mar. 7, 1930, p. 332)
Construction of quay, 11,000 ft. long, also of passenger station situated 2 mi. from mouth of Tyne River; description of shed 500 ft. long by 60 ft. wide, hydraulic coal hoist, two electric traveling portal cranes of 5 and 3 tons capacity, and seven 1 1/2-ton hydraulic capstans, steel sheet piling and anchor blocks; dredging and sinking of cylinders; electric substation and hydraulic power house. (see also Civil Eng., vol. 24, no. 8, Jan. 1930, p. 391, and Engineering, vol. 129, no. 3347, Mar. 7, 1930, p. 332)
Tyne commission quay, north shields
Instn. Civil Engrs. -- Minutes Proc
Hindmarsh, R.F. (author)
1930
17 pages
7 Figs., on Supp. plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tyne commission quay, north shields
Engineering Index Backfile | 1930
|Tyne commission quay, North Shields
Engineering Index Backfile | 1931
|Tyne commission quay, north shields
Engineering Index Backfile | 1930
|New quay at Willington-on-Tyne
Engineering Index Backfile | 1941
Quay extension works at Newcastle-upon-Tyne
Engineering Index Backfile | 1913
|