A platform for research: civil engineering, architecture and urbanism
New quay at Willington-on-Tyne
Details of quay constructed by Tyne Improvement Commission, which has length of 650 ft and dredged depth alongside of 27 ft below high water; steel sheet piling used in its construction; diagrams and Illustrations given.
New quay at Willington-on-Tyne
Details of quay constructed by Tyne Improvement Commission, which has length of 650 ft and dredged depth alongside of 27 ft below high water; steel sheet piling used in its construction; diagrams and Illustrations given.
New quay at Willington-on-Tyne
Dock Harbour Authority
1941
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tyne commission quay, north shields
Engineering Index Backfile | 1930
|Tyne commission quay, north shields
Engineering Index Backfile | 1930
|Tyne commission quay, North Shields
Engineering Index Backfile | 1931
|Tyne commission quay, north shields
Engineering Index Backfile | 1930
|Quay extension works at Newcastle-upon-Tyne
Engineering Index Backfile | 1913
|