A platform for research: civil engineering, architecture and urbanism
Description of Colorado-Big Thompson project for diverting headwaters of Colorado River, on western slope of Continental Divide, to 800, 000 acre area on eastern slope; estimated cost is $44,000, 000; present status of project.
Description of Colorado-Big Thompson project for diverting headwaters of Colorado River, on western slope of Continental Divide, to 800, 000 acre area on eastern slope; estimated cost is $44,000, 000; present status of project.
Colorado-Big Thompson project, Colorado
Civ Eng (NY)
Preston, P.J. (author)
1938
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Colorado-Big Thompson project, Colorado
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1957
Transmission line construction, Colorado-big Thompson project, Colorado
Engineering Index Backfile | 1941
|Earth-fill construction, Green mountain dam, Colorado-big Thompson project, Colorado
Engineering Index Backfile | 1940
|Continental divide tunnel station 6 + 00 to station 72 + 00. Colorado-big Thompson project, Colorado
Engineering Index Backfile | 1940