Transmission line construction, Colorado-big Thompson project, Colorado
Construction of 27-mi long 3-phase, 3-wire, 115,000-v single-circuit, 60-cycle high tension transmission line from Dillon to Green Mountain Dam, using No. 4/0 steel reinforced, aluminum stranded conductors, features of substations; pole setting operations.
Transmission line construction, Colorado-big Thompson project, Colorado
Construction of 27-mi long 3-phase, 3-wire, 115,000-v single-circuit, 60-cycle high tension transmission line from Dillon to Green Mountain Dam, using No. 4/0 steel reinforced, aluminum stranded conductors, features of substations; pole setting operations.
Transmission line construction, Colorado-big Thompson project, Colorado
Reclamation Era
Thomas, F.J. (author)
Reclamation Era ; 31
1941
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Colorado-Big Thompson project, Colorado
Engineering Index Backfile | 1938
|Colorado-Big Thompson project, Colorado
Engineering Index Backfile | 1938
|Earth-fill construction, Green mountain dam, Colorado-big Thompson project, Colorado
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1957
Colorado-Big Thompson project -- Technical record of design and construction
Engineering Index Backfile | 1957