A platform for research: civil engineering, architecture and urbanism
Savings effected by use of high early strength cement, duplicate sets of forms, or careful design of ordinary portland cement mix; erection time; effect of water content on concrete strengths; working days required for completion of concrete frame; figuring low-cost schedule; comparison of cost of various schedules; job data from six recent contracts. (See also - n 5 May (discussion) p 354)
Savings effected by use of high early strength cement, duplicate sets of forms, or careful design of ordinary portland cement mix; erection time; effect of water content on concrete strengths; working days required for completion of concrete frame; figuring low-cost schedule; comparison of cost of various schedules; job data from six recent contracts. (See also - n 5 May (discussion) p 354)
Cutting costs in concrete construction
Civ Eng (NY)
Gruenwald, E. (author)
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cutting costs in concrete construction
Engineering Index Backfile | 1938
|Concrete construction costs in Cuba
Engineering Index Backfile | 1912
|Lightweight concrete for lower construction costs
Engineering Index Backfile | 1951
|Unit costs of reinforced concrete building construction
Engineering Index Backfile | 1909
|