A platform for research: civil engineering, architecture and urbanism
Bonanza in lake-bottom dirt
Fill for elevated superhighway in Orlando, Fla was borrowed from adjacent lake, where 256,000 cu yd was staked out; fleet of three dredges pumped fill material directly onto road embankment at rates up to 200 yd/hr; dredges consisted of large pump on steel-pontoon float; diesel engine powered 6-in. pump through V-belt drive and also ran 2-in. jet pump; hydraulic placement gave specification density automatically.
Bonanza in lake-bottom dirt
Fill for elevated superhighway in Orlando, Fla was borrowed from adjacent lake, where 256,000 cu yd was staked out; fleet of three dredges pumped fill material directly onto road embankment at rates up to 200 yd/hr; dredges consisted of large pump on steel-pontoon float; diesel engine powered 6-in. pump through V-belt drive and also ran 2-in. jet pump; hydraulic placement gave specification density automatically.
Bonanza in lake-bottom dirt
Excavating Engr
Excavating Engineer ; 58
1964
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lake-bottom dirt makes runway fill
Engineering Index Backfile | 1961
Engineering Index Backfile | 1953
|RADAR - Students - Biennale bonanza
Online Contents | 2000
British Library Online Contents | 1996
|British Library Online Contents | 1993