A platform for research: civil engineering, architecture and urbanism
Lake-bottom dirt makes runway fill
Two MM yd of hydraulic fill is placed within timber bulkhead to extend runway of New Orleans airport 2000 ft into Lake Pontchartrain, La; lake-bottom borrow pit about mile away supplies all of fill; hydraulic dredge issued for placing.
Lake-bottom dirt makes runway fill
Two MM yd of hydraulic fill is placed within timber bulkhead to extend runway of New Orleans airport 2000 ft into Lake Pontchartrain, La; lake-bottom borrow pit about mile away supplies all of fill; hydraulic dredge issued for placing.
Lake-bottom dirt makes runway fill
Construction Methods Equipment
1961
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
Lot of dirt dumped in Idaho's largest highway fill
Engineering Index Backfile | 1953
Difficult work on highway fill in muck-bottom lake
Engineering Index Backfile | 1930
Modern earthmoving equipment makes dirt fly in North Dakota
Engineering Index Backfile | 1947