A platform for research: civil engineering, architecture and urbanism
Completing dual highway between Toronto and Oshawa
Illustrated report on construction of dual highway between Highland Creek and Oshawa, Ont; both trafficways are centercrowned so that drainage is towards both shoulders and boulevard; extracts from specifications for excavation, compacting, pavement, concrete mixing, and curing methods are presented. (See also Roads and Bridges v 84 n 9 Sept 1946 p 57-60, 128)
Completing dual highway between Toronto and Oshawa
Illustrated report on construction of dual highway between Highland Creek and Oshawa, Ont; both trafficways are centercrowned so that drainage is towards both shoulders and boulevard; extracts from specifications for excavation, compacting, pavement, concrete mixing, and curing methods are presented. (See also Roads and Bridges v 84 n 9 Sept 1946 p 57-60, 128)
Completing dual highway between Toronto and Oshawa
Eng Contract Rec
1946
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Completing dual highway between Toronto and Oshawa
Engineering Index Backfile | 1946
Engineering Index Backfile | 1942
|Paving methods on Toronto-Oshawa dual highway
Engineering Index Backfile | 1946
Bridge features on dual highway from highland creek to Oshawa
Engineering Index Backfile | 1942
|Experimenting with rubber-base jointing materials on Oshawa highway
Engineering Index Backfile | 1947