A platform for research: civil engineering, architecture and urbanism
Completing dual highway between Toronto and Oshawa
Illustrated report on construction of dual highway between Highland Creek and Oshawa, Ont; both trafficways are centercrowned so that drainage is towards both shoulders and boulevard; extracts from specifications for excavation, compacting, pavement, concrete mixing, and curing methods are presented. (see also Eng and Contract Rev v 59 n 11 Nov 1946 p 54-8, 128-30)
Completing dual highway between Toronto and Oshawa
Illustrated report on construction of dual highway between Highland Creek and Oshawa, Ont; both trafficways are centercrowned so that drainage is towards both shoulders and boulevard; extracts from specifications for excavation, compacting, pavement, concrete mixing, and curing methods are presented. (see also Eng and Contract Rev v 59 n 11 Nov 1946 p 54-8, 128-30)
Completing dual highway between Toronto and Oshawa
Roads Bridges
Roads and Bridges ; 84
1946
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Completing dual highway between Toronto and Oshawa
Engineering Index Backfile | 1946
Engineering Index Backfile | 1942
|Paving methods on Toronto-Oshawa dual highway
Engineering Index Backfile | 1946
Bridge features on dual highway from highland creek to Oshawa
Engineering Index Backfile | 1942
|Experimenting with rubber-base jointing materials on Oshawa highway
Engineering Index Backfile | 1947