A platform for research: civil engineering, architecture and urbanism
Earthmoving works on 1.5 million yd schedule for earthfill dam of U S Bur Reclamation will have 8 ml length, 130 ft height, 21 MM cu yd volume and create reservoir of 600,000 acre-ft; center core dug through water bearing gravel and filled with impervious clay and silt before placing compacted earth; outlet works will have 35,700 cfs capacity and spillway 47,300 second feet.
Earthmoving works on 1.5 million yd schedule for earthfill dam of U S Bur Reclamation will have 8 ml length, 130 ft height, 21 MM cu yd volume and create reservoir of 600,000 acre-ft; center core dug through water bearing gravel and filled with impervious clay and silt before placing compacted earth; outlet works will have 35,700 cfs capacity and spillway 47,300 second feet.
Production zooms at Twin Buttes
Excavating Engr
Day, R. (author)
Excavating Engineer ; 55
1961
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
Online Contents | 2005
Dirt moved fast at low cost on Twin Buttes Dam
Engineering Index Backfile | 1962
|Improving Trails on Arizona Buttes
Online Contents | 1998
|