A platform for research: civil engineering, architecture and urbanism
Solving rocky problems at Round Butte Dam
Site of Round Butte Dam, Portland General Electric Co's $ 60,000,000 project in canyon of Deschutes River near Madras, Ore, is geological masterpiece; it includes rock so tough it requires special methods to shoot it, and so permeated with fines that special separation plant is needed to process it; 9,470,000 cu yd of rock fill placed on 440 ft high structure; processing of fill; liner fabrication.
Solving rocky problems at Round Butte Dam
Site of Round Butte Dam, Portland General Electric Co's $ 60,000,000 project in canyon of Deschutes River near Madras, Ore, is geological masterpiece; it includes rock so tough it requires special methods to shoot it, and so permeated with fines that special separation plant is needed to process it; 9,470,000 cu yd of rock fill placed on 440 ft high structure; processing of fill; liner fabrication.
Solving rocky problems at Round Butte Dam
Western Construction
Western Construction ; 37
1962
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2003
|Some unusual aspects of Round Butte Project
Engineering Index Backfile | 1965
|Solution of vibration problems experienced with Howell-Bunger valves at Round Butte dam
Engineering Index Backfile | 1967
|Pelton Round Butte Relicensing: Lessons Learned from a Negotiated Settlement
British Library Online Contents | 2006
|Positive Results from Fish Collection System at Round Butte Dam
British Library Online Contents | 2012
|