A platform for research: civil engineering, architecture and urbanism
Technique of using girder span as temporary falsework for erecting bridge steel applied in construction of 1000 ft bridge over Pembina River valley at Entwistle; bridge truss fitted with adjustable joints and jacks supports long cantilever section during construction.
Technique of using girder span as temporary falsework for erecting bridge steel applied in construction of 1000 ft bridge over Pembina River valley at Entwistle; bridge truss fitted with adjustable joints and jacks supports long cantilever section during construction.
Bridge Truss acts as falsework
Eng Contract Rec
Taylor, W.B. (author)
1962
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete truss bridges erected without falsework
Engineering Index Backfile | 1920
Existing girders act as falsework for new truss span
Engineering Index Backfile | 1963