Construction of first phase of Colorado tunnel project, designed to bring 74,000 acre ft of water annually to plains, cities of Aurora and Colorado Springs by 1970 is described; project is advancing at rate of over 44 ft/day; car switcher and exhaust scrubber were used in operation; slusher train was used on test basis.
Driving homestake tunnel
Construction of first phase of Colorado tunnel project, designed to bring 74,000 acre ft of water annually to plains, cities of Aurora and Colorado Springs by 1970 is described; project is advancing at rate of over 44 ft/day; car switcher and exhaust scrubber were used in operation; slusher train was used on test basis.
Driving homestake tunnel
Western Construction
Western Construction ; 39
1964
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Homestake project's Rocky challenge
Engineering Index Backfile | 1965
Engineering Index Backfile | 1911
|British Library Conference Proceedings | 1993
|Engineering Index Backfile | 1959
|NEWSMAKERS - Homestake Closing Namesake Mine
Online Contents | 2000