A platform for research: civil engineering, architecture and urbanism
Hydro-Quebec finishes first and pushes second Bersimis River job
Bersimis I is 1.2 mhp underground powerhouse that takes water from behind two rockfill dams through 7 1/2 mi lined tunnel; 855,000 hp Bersimis II installation is 5-unit powerhouse, situated alongside sheer granite mountain, through which 2700 ft power tunnel leads waters of Bersimis River; 280 ft high concrete dam and two earthfill dams provide storage.
Hydro-Quebec finishes first and pushes second Bersimis River job
Bersimis I is 1.2 mhp underground powerhouse that takes water from behind two rockfill dams through 7 1/2 mi lined tunnel; 855,000 hp Bersimis II installation is 5-unit powerhouse, situated alongside sheer granite mountain, through which 2700 ft power tunnel leads waters of Bersimis River; 280 ft high concrete dam and two earthfill dams provide storage.
Hydro-Quebec finishes first and pushes second Bersimis River job
Eng News-Rec
Engineering News-Record ; 159
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydro-Quebec is developing more than horse power at Bersimis
Engineering Index Backfile | 1955
|Engineering Index Backfile | 1955
Closure to “Patterson and MacDonald on Bersimis Dams”
ASCE | 2021
|Ontario hydro pushes work on power dam at Stewartville
Engineering Index Backfile | 1948
Online Contents | 1994