A platform for research: civil engineering, architecture and urbanism
Hydro-Quebec is developing more than horse power at Bersimis
Status of Hydro-Quebec's project which involves harnessing some 1,200, 000 hp on Bersimis River; two major dams will back water up into Pipmuacan Lake, namely, 3,800,000-cu yd Main Dam and 1,302,000-cu yd Desroches River Dam; constructional features of dams, power tunnels, penstocks, surge shaft powerhouse cavern, and other plant components.
Hydro-Quebec is developing more than horse power at Bersimis
Status of Hydro-Quebec's project which involves harnessing some 1,200, 000 hp on Bersimis River; two major dams will back water up into Pipmuacan Lake, namely, 3,800,000-cu yd Main Dam and 1,302,000-cu yd Desroches River Dam; constructional features of dams, power tunnels, penstocks, surge shaft powerhouse cavern, and other plant components.
Hydro-Quebec is developing more than horse power at Bersimis
Eng News-Rec
Fox, Jr., A.J. (author)
Engineering News-Record ; 155
1955
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydro-Quebec finishes first and pushes second Bersimis River job
Engineering Index Backfile | 1957
Engineering Index Backfile | 1955
Closure to “Patterson and MacDonald on Bersimis Dams”
ASCE | 2021
|Online Contents | 1994
Special repairs to the Bersimis-1 generating tunnel walls to increase power production: a case study
Online Contents | 2001
|