A platform for research: civil engineering, architecture and urbanism
Heavy excavation in northern Idaho mountains through bottleneck for four lane highway described; maximum grade will be 5 1/2%, sharpest curves will be 6°; there will be rock cuts 170 ft deep, and fills up to 350,000 cu yd; all cuts to be opened as much as possible to make room for snow disposal in winter; excavation operations and equipment described.
Heavy excavation in northern Idaho mountains through bottleneck for four lane highway described; maximum grade will be 5 1/2%, sharpest curves will be 6°; there will be rock cuts 170 ft deep, and fills up to 350,000 cu yd; all cuts to be opened as much as possible to make room for snow disposal in winter; excavation operations and equipment described.
Idaho's biggest road job
Excavating Engr
Day, R. (author)
Excavating Engineer ; 51
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Idaho's State and Private Forest Resource
NTIS | 1985
|Labor saving methods at Idaho's Sandpoint bridge
Engineering Index Backfile | 1955
|COURT INTERPRETERS IN IDAHO'S CRIMINAL COURTS
British Library Online Contents | 2005
|Idaho's Canada Lynx: Pieces of the Puzzle
NTIS | 1998
|