A platform for research: civil engineering, architecture and urbanism
Labor saving methods at Idaho's Sandpoint bridge
5897-ft bridge constructed over Pend Oreille Lake consists of 154 basic spans at 35 ft with each 6-span unit separated by 17-ft tower span of which there are 25; except for 82-ft steel navigational span, all spans are precast reinforced concrete of 5-stringer and slab section; precasting and placing operations. (see also World Construction v 8 n 4 July-Aug 1955 p 36-7, 40-2, 44)
Labor saving methods at Idaho's Sandpoint bridge
5897-ft bridge constructed over Pend Oreille Lake consists of 154 basic spans at 35 ft with each 6-span unit separated by 17-ft tower span of which there are 25; except for 82-ft steel navigational span, all spans are precast reinforced concrete of 5-stringer and slab section; precasting and placing operations. (see also World Construction v 8 n 4 July-Aug 1955 p 36-7, 40-2, 44)
Labor saving methods at Idaho's Sandpoint bridge
Roads Streets
Stirminski, L.F. (author)
Roads and Streets ; 98
1955
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Labor saving methods at Idaho's Sandpoint bridge
Engineering Index Backfile | 1955
|Mile-long bridge at Sandpoint is ready for construction
Engineering Index Backfile | 1954
Engineering Index Backfile | 1957
|Idaho's equipment and methods for center-line striping
Engineering Index Backfile | 1940
|