A platform for research: civil engineering, architecture and urbanism
Model helps on tough foundation job
At 20 story Crown-Zellerbach building in San Francisco, bottom of main foundation slab was 39 to 47 ft below level of streets; foundation is 8 ft thick concrete slab; utility core is supported on 6 ft 9 in. thick slab and rest of construction requires 4 ft thick foundation slab; foundation excavation work surrounded site with sheetpiling.
Model helps on tough foundation job
At 20 story Crown-Zellerbach building in San Francisco, bottom of main foundation slab was 39 to 47 ft below level of streets; foundation is 8 ft thick concrete slab; utility core is supported on 6 ft 9 in. thick slab and rest of construction requires 4 ft thick foundation slab; foundation excavation work surrounded site with sheetpiling.
Model helps on tough foundation job
Eng News-Rec
Engineering News-Record ; 160
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Paper forms solve tough foundation problem
Engineering Index Backfile | 1954
|Imported boring rigs complete tough foundation job
Engineering Index Backfile | 1961
Physical Therapy Building, Philadelphia, Pa.: A tough, small building helps a campus face its future
British Library Online Contents | 1997
British Library Online Contents | 2008
|