A platform for research: civil engineering, architecture and urbanism
Imported boring rigs complete tough foundation job
Foundations of 1200 by 70 ft and 240 ft high grain elevator structure are supported on caissons placed by French Benoto machine; hydraulic, semirotary, boring rigs of Benoto system place and remove large diameter casings and can walk and turn on hydraulic jacks in confined spaces; 39 in. diam caissons were placed to support each column in structure, instead of previously planned 9 piles for each; 15% saving was achieved.
Imported boring rigs complete tough foundation job
Foundations of 1200 by 70 ft and 240 ft high grain elevator structure are supported on caissons placed by French Benoto machine; hydraulic, semirotary, boring rigs of Benoto system place and remove large diameter casings and can walk and turn on hydraulic jacks in confined spaces; 39 in. diam caissons were placed to support each column in structure, instead of previously planned 9 piles for each; 15% saving was achieved.
Imported boring rigs complete tough foundation job
Eng News-Rec
Engineering News-Record ; 167
1961
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Columns - Editor's Note - Rigs, glorious rigs
Online Contents | 2001
Model helps on tough foundation job
Engineering Index Backfile | 1958
Paper forms solve tough foundation problem
Engineering Index Backfile | 1954
|Drill rigs - Drill rigs as an excavation choice
Online Contents | 2014
|