A platform for research: civil engineering, architecture and urbanism
Mangla dam project
Rolled fill earth embankment dam will be flanked by power plant on left and spillway structure on right; power house will have installed capacity of 300,000 kw (4 sets of 75,000 kw each power head varying between 54.9 m and 96 m); spillway will be for routed flood of 28,310 m3/sec capacity; it will be fitted with automatic gates.
Mangla dam project
Rolled fill earth embankment dam will be flanked by power plant on left and spillway structure on right; power house will have installed capacity of 300,000 kw (4 sets of 75,000 kw each power head varying between 54.9 m and 96 m); spillway will be for routed flood of 28,310 m3/sec capacity; it will be fitted with automatic gates.
Mangla dam project
India J Power River Valley Development
1957
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
|British Library Conference Proceedings | 2004
|Engineering Index Backfile | 1966
Foundation problems on Mangla dam project
Engineering Index Backfile | 1967
|Monitoring of Clay Core : Mangla Dam Project
British Library Conference Proceedings | 1991
|